The G/F and 2/F was heavy with men and equipment, it is where all the work was being done when the rains poured heavy the last 2 months.

Now that the sun is out, work is done outside and we are able to clear the interiors to get a feel of the size of the space.

IMG_7606

 

IMG_7607

 

IMG_7608

 

IMG_7622