Come a Little Bit Closer
A super close up shot from the scaffolding showing the new insulation installed between the trusses.
A super close up shot from the scaffolding showing the new insulation installed between the trusses.
Each time I climb the makeshift ladder to reach the 3/F, I ask myself what can make this floor as special as the 2/F (with interior stone walls). The 3/F will have walls that are essentially the inside walls of the mansard roof. What do you think about a faux finish…