It has been raining in Calistoga (sad, but we do need the rain) so work has stalled. But here are this week’s photos:  below, showing the back opening with the beams.

 

2016-10-26-photo-00000135

 

And an interior shot with the second floor joists all in.

 

2016-10-26-photo-00000138

 

Slowly, we are getting a better sense of the (compact) space. We have been re-working the lay-out (the kitchen especially) from some structural and exhaust constraints.