Three days ago the insulation was laid.

Today, the reinforced bars were installed together with the radiant heat pipes (red pipes). The warm water that passes through these red pipes will channel heat giving warmth on bare feet.

Now, after many months waiting, there is a level floor to walk on. The possibility of twisting your ankles on site visits has been significantly reduced. 🙂