It has been raining in Calistoga (sad, but we do need the rain) so work has stalled. But here are this week’s photos: below, showing the back opening with the beams.
And an interior shot with the second floor joists all in.
Slowly, we are getting a better sense of the (compact) space. We have been re-working the lay-out (the kitchen especially) from some structural and exhaust constraints.